Ethiopia - Gedeo/West Guji Rapid Response Collective Site Assessment Round 4

Share

Share

Contact
DTM Ethiopia, SLOAddisAbabaDTM@iom.int
Location
Ethiopia
Activity
  • Mobility Tracking
  • Site Assessment
Period Covered
Nov 12 2018 -
Nov 30 2019
The DTM Rapid Response Assessment tool is designed to provide detailed information at site level for emergencies occurring outside the DTM Mobility Tracking data collection periods. IDP community leaders collaborated closely with IOM as key informants during the assessment with the aim to provide the humanitarian community with up-to-date information on the locations, needs and demographics of displaced populations.
Population Groups

Survey Methodology

Unit of Analysis Or Observation

Type of Survey or Assessment

Keywords

Geographical Scope

Administrative boundaries with available data

The current dataset covers the following administrative boundaries